Send us a message, and we will definitely consider your suggestions and comments.
The first and so far the only beneficiary of direct funding from the Romanian Agency for International Development Cooperation (RoAid) was the Balti City Hall,” Logos Press reported.

Professionals who participated in the design, project verification, construction and acceptance of a residential building in Durlesti, which was damaged by a fire, will have their professional certification certificates revoked, Logos Press reports.

Construction of a Solid Waste Management Center is underway at a former temporary landfill site in the capital’s Chokan sector,” Logos Press reported.

Measures to protect and enhance the value of monuments will be able to be financed from the National Fund of Culture, – reports Logos Press .

The project “Cities and Regions for All: Full Integration of Refugees and Migrants into the Urban and Rural Environment of Moldova” was launched in Chisinau. An international conference on this topic was held in Prague with the financial support of the Czech Development Agency,” Logos Press reports.

The Northern capital of Moldova reported the completion of reconstruction of a 16-storey, the tallest building in the city as part of the “First Swallows” project. After all the works, its residents are expected to save up to 35% of energy,” Logos Press reported.

In the first 5 months of 2025, the amount of income tax from individuals renting out real estate amounted to 37.1 million lei, up 30.3% compared to the same period last year,” Logos Press reported.

The completion of the overhaul of the bridge on Mihai Vitaizul Street in Chisinau is scheduled for the end of 2025, – Logos Press reports.

Mass valuation (or revaluation) for tax purposes of garden plots with or without dacha houses will be carried out according to a new model,” Logos Press reports.

Almost 9 thousand residents of Dondusheni, including students of three theoretical lyceums, will have an opportunity to play sports and spend active leisure time in modern and comfortable conditions, – reports Logos Press.

The Moldovan government at a June 5 meeting approved the Methodology of rapid visual assessment of buildings to determine their seismic risk level, Logos Press reported.

A sports complex with a swimming pool will be built in Budesti village, one of the nearest suburbs of Chisinau,” Logos Press reports.

On Hristo Botev Street in the Botanica sector of the capital, works are underway to reconstruct the carriageway, construct parking lots and pedestrian sidewalks, including those with tactile sidewalk, bike lanes and green areas, install city furniture and modernize street lighting,” Logos Press reports.

Causeni has completed two major water and sewerage infrastructure modernization projects funded by the government through the National Fund for Regional and Local Development, Logos Press reports

The Cabinet of Ministers has approved the start of negotiations and the signing of a protocol on amending the agreement with Romania on state border crossing points. The document envisages the creation of a new border crossing point (BCP) “Ungheni-Ungheni”,” Logos Press reported.

Within the framework of the Program of Measures for the Reintegration of the Country for 2025, 30 more development projects will be implemented in the settlements that are located in the Security Zone,” Logos Press reported.

The Cabinet approved amendments to a number of regulations in the context of the application of the Town Planning and Building Code, which will come into force in January 2025, – reports Logos Press.

According to the NBS, in 2024, the total length of water supply networks in Moldova will amount to 21.6 thousand km (compared to 2023, up by 3%), and sewerage – 5.7 thousand km (+3.6%), – reports Logos Press.

About 105.5 million lei from the National Fund for Regional and Local Development (FNDRL) has been allocated for the implementation of projects in the South Development Region. This decision was taken by the National Council for Coordination of Regional and Local Development,” Logos Press reported.

By the decision of the Extraordinary Commission, 1.22 million lei will be allocated for the construction of a temporary roof and removal of waste after the fire. At the same time, 55.8 thousand lei will be allocated for the technical expertise of the attic floor,” Logos Press reported.
