The centralized heating system in Chisinau is due for modernization - logos-pres.md
EUR/MDL - 20.22 0.0642
USD/MDL - 17.64 0.0591
VMS_91 - 3.03%
VMS_364 - 9.54%
BONDS_2Y - 7.40%
GOLD - 4,155.68 0.9%
EURUSD - 1.15 0%
BRENT - 107.14 8.65%
SP500 - 746.74 1.04%
SILVER - 64.84 0.78%
GAS - 2.94 6.14%

The centralized heating system in Chisinau is due for modernization

The Cabinet of Ministers is starting negotiations with the European Investment Bank (EIB) on the optimization of the district heating system in Chisinau municipality, Logos Press reported.
Татьяна Глазова Reading time: 1 minute
Text size
Link copied
The centralized heating system in Chisinau is due for modernization

According to the Ministry of Energy, under the project, financed by the EIB in the amount of 143.5 million euros, more than 2,500 individual heating points will be installed, another 1,665 residential buildings will be converted to a horizontal heat distribution system, and 57 buildings will undergo thermal insulation and reconstruction of primary heating networks. Two heat pump stations will be built at the same time.

According to preliminary estimates, the implementation of these measures will save about 4,600 MWh of primary energy over 20 years, reduce CO₂ emissions by about 816 thousand tons, and significantly improve the energy efficiency of services provided to end consumers.

The central element of the project is the introduction of individual heat consumption metering systems. This will provide residents with an opportunity to control heat consumption depending on the specific needs of each house.

It is expected that more than 300 thousand houses in Chisinau will be connected to this system.


Follow our updates


Реклама недоступна
More from author*

We always appreciate your feedback!

Latest news
Popular now*
Must Read*