International experts from North Macedonia, Croatia and Great Britain presented the results of the feasibility study for the modernization of Termoelectrica SA. According to preliminary data, the cost of construction of the new CHPP is estimated at approximately 200-250 million euros.

An international tender to select a contractor for the construction of two new CHPPs in Chisinau is ongoing. Four companies – from Turkey, Hungary and Azerbaijan – are participating in it. The contractor will be tasked with the construction from scratch of two new CHPPs, equipped with modern equipment, with a total electric capacity of 55 MW and a heat capacity of 43 Gcal/h.
