Send us a message, and we will definitely consider your suggestions and comments.
Turbo Energy Power has reacted and refuted President Maia Sandu’s statements accusing them of involvement in the delay in the commissioning of the Vulcanesti substation.

Chronic depletion and inequitable distribution of surface and groundwater resources is becoming the new norm of an era of global water bankruptcy that the world community will have to adapt to, Logos Press reports.

Greece’s Atlantic Sea LNG Trade is in talks with the United States to supply up to 15 billion cubic meters of gas per year for the next 20 years, Logos Press reported.

The energy systems of Georgia and Europe will be connected by an underwater high-voltage power transmission line with a length of 1,155 kilometers, which will be stretched along the bottom of the Black Sea with a connection point in Romania, Logos Press reports.

The SCADEX LiveGrid project, which is a digital system for real-time monitoring of low-voltage power grids, will be implemented as part of the Energy Sandbox working under the patronage of the Ministry of Energy, Logos Press reported.

More than 87,000 electric and hybrid vehicles have been registered in the Republic of Moldova from 2018 to the end of 2025. The accelerated growth of registrations confirms the growing interest of the population and the business environment in energy-efficient and environmentally friendly transportation solutions, Logos Press reported.

In 2024, Moldovan enterprises from different economic sectors produced a total of 227.35 thousand tons of waste, according to data from the automated waste management information system (SIA MD).

Vitalie Mîța was appointed at a government meeting on November 4 as the new state secretary of the Energy Ministry, responsible for the thermal power, natural gas and energy efficiency sectors, Logos Press reported.

The Apele Moldovei agency is obliged to identify ponds and reservoirs damaging the environment every five years and apply liquidation procedures to them, Logos Press reported.

Three parliamentary factions – Our Party, the Alternative bloc and the Democrația Acasă party – initiated a simple vote of no confidence against the state’s energy policy, Logos Press reported.

Russian gas deliveries to Europe via the Turkish Stream pipeline remained at a sustained high level of 1.61 billion cubic meters in January, according to an analysis of data from February 2. ENTSOG data compiled by S&P Global Energy CERA, deliveries to Europe via the Turkish Stream pipeline through the Strandzha-2 checkpoint on the Turkish-Bulgarian border averaged 52 million cubic meters per day during the month.

International investment energy company XRG (United Arab Emirates) has announced signing a sale and purchase agreement with the Ministry of Economy of Azerbaijan to acquire a stake in the authorized capital of Southern Gas Corridor CJSC (SGC), Logos Press reports.

UPDATE The National Energy Regulatory Agency (ANRE) has approved a new tariff for natural gas for household consumers. The new price will amount to 14.43 lei per cubic meter, which is 13.8% lower than the current tariff of 16.74 lei per m3, Logos Press reported.

Heating bills in Lithuania in January this year almost doubled compared to December, said Valdas Lukoskevičius, president of the Lithuanian Association of Heat Supply Providers, according to Logos Press.

Washington is pressuring Europe to lower the cost of transit of U.S. LNG from Greece to Ukraine via Bulgaria, Romania and the Republic of Moldova.

The phenomenon of “greenwashing” – where companies create the appearance of environmental responsibility without actually acting – is becoming a systemic threat to food security, according to Logos Press.

The process of restoring power to the transmission system has been completed nationwide – all 110 kV electrical substations have received power, Logos Press reported.

Energy Minister Dorin Jungietu said that the process of restoring power supply is at an advanced stage, Logos Press reported.

Due to an emergency voltage drop in the national electricity system, caused by problems on the 400 kV Isaccea-Vulcanesti-MGRES high-voltage line, temporary disruptions in the operation of the district heating system were recorded in Chisinau,” Logos Press reported.

Armenia could connect its energy system to the grids of Azerbaijan and Turkey, which would bring economic benefits, enhance regional security and allow the South Caucasus to become a strong energy exporter, Logos Press reported.
