Send us a message, and we will definitely consider your suggestions and comments.
Almost 9 thousand residents of Dondusheni, including students of three theoretical lyceums, will have an opportunity to play sports and spend active leisure time in modern and comfortable conditions, – reports Logos Press.
An example of how all norms of the building legislation are violated is a residential building in Durlesti, in whose attic there was a fire recently. The National Inspectorate for Technical Supervision (INST) published the first results of the inspection. As it turned out, violations were detected at all stages of the investment process.
Not only the convenience and comfort of the residents or those who operate these buildings depends on how well the construction work is done. But also safety and even their lives. That is why, especially when buying a home, potential buyers have become increasingly interested in who provides quality control of construction work. And who to turn to if after buying a home defects are revealed.
The Moldovan government at a June 5 meeting approved the Methodology of rapid visual assessment of buildings to determine their seismic risk level, Logos Press reported.
A sports complex with a swimming pool will be built in Budesti village, one of the nearest suburbs of Chisinau,” Logos Press reports.
On Hristo Botev Street in the Botanica sector of the capital, works are underway to reconstruct the carriageway, construct parking lots and pedestrian sidewalks, including those with tactile sidewalk, bike lanes and green areas, install city furniture and modernize street lighting,” Logos Press reports.
The Cabinet of Ministers has approved the Regulation, which should increase the effect of public consultations when discussing town planning plans.
In Chisinau, the interim results of the development of the Historic-Architectural Reference Plan and the project of protection zones of the historical core of Chisinau were presented.
The activity of home buyers in Chisinau and its suburbs is decreasing, as evidenced by the data on the number of sales transactions for the first quarter of 2025. And it is not only because of inflated prices, but in some cases also because of the quality of apartments and houses that do not meet the needs of buyers. That is why some objects fly away like hotcakes, and others do not arouse interest for months.
Causeni has completed two major water and sewerage infrastructure modernization projects funded by the government through the National Fund for Regional and Local Development, Logos Press reports
The Cabinet of Ministers has approved the start of negotiations and the signing of a protocol on amending the agreement with Romania on state border crossing points. The document envisages the creation of a new border crossing point (BCP) “Ungheni-Ungheni”,” Logos Press reported.
Within the framework of the Program of Measures for the Reintegration of the Country for 2025, 30 more development projects will be implemented in the settlements that are located in the Security Zone,” Logos Press reported.