Send us a message, and we will definitely consider your suggestions and comments.
The first financing of 9.5 million lei was approved for the energy rehabilitation of multi-storey residential buildings in Chisinau, Hincesti and Ialoveni,” Logos Press reported.
Photovoltaic parks will appear in five Moldovan localities thanks to European investments of 12.3 million lei (about 634,000 euros),” Logos Press reported.
The Department of Energy has proposed an individual ceiling of 10 kW for households that are renewable energy consumers,” Logos Press reports.
Moldovan startup CND SRL has created a revolutionary biodegradable thermal insulation material from industrial and agricultural waste. This eco-friendly solution reduces environmental impact and replaces traditional insulation materials that are often harmful to the environment.
Photovoltaic panels installed by the Municipality of Pervomaysc village, Causeni district, will cover part of the energy consumption of the pumps that supply drinking water to more than 900 residents,” Logos Press reported. Pervomaysk village, Causeni district, will cover part of the energy consumption of the pumps that supply drinking water to more than 900 residents,” Logos Press reported.
A Recycling and Environmental Management Center (CRME) will be built in the capital of Moldova as part of the Municipal Solid Waste Project financed by the EBRD and the European Investment Bank. The total amount of the project is estimated at EUR 200 million. The relevant loan agreements with these institutions have already been signed, and they provide for a grant component.
In the first quarter of 2025, the installed capacity of energy from renewable sources in Moldova increased by 77.75 MW to reach 657.15 MW,” Logos Press reported.
The first five associations of owners in condominiums (APCs) in Chisinau and Balti have received technical project documentation developed with the free support of the National Center for Sustainable Energy (CNED), which gives them access to funds from the Fund for Energy Efficiency in the Moldovan Housing Sector (FEERM) – Logos Press reports.
During the period of cleaning up before Easter, many people burn old tires, which causes serious damage to the environment. To prevent and extinguish tire burning fires, environmental inspectors conducted 75 inspections. A total of 67 cases were documented. Each of them will be fined, 11 receipts have already been issued for a total of 110 thousand lei.
The tender commission responsible for Moldova’s first renewable energy auction has confirmed its decision to reject the bids of four companies,” Logos Press reported.
The individual power ceiling for residential prosumer PV installations may be raised to 7 kW, and current beneficiaries of the net billing mechanism who have a prosumer contract with their supplier for a lower individual power ceiling will be able to request an increase to the 7 kW sustainability limit,” Logos Press reports.
Investors must obtain permits for the construction of renewable energy generating facilities on the territory of the unrecognized PMR within a maximum of 30 days,” Logos Press reported.